CONSTRUCTION - ERECTION

Introduction
Commitment
ERECTION PROCESS
Quy trình
TẠI SAO CHỌN

Introduction

• Erection is the final step in the construction process of steel and prefabricated steel plants. In this step, all components will be installed at the construction site and the joints bolted together.

• In addition to an elite technical installation and construction team with decades of experience, DTC also has advanced machinery and equipment systems to support and assist in the necessary construction phases to ensure the quality and progress of the project construction.

Document

To better understand the product & service solutions as well as the capabilities and service commitments of DTC Steel, we invite you to view our Company Profile.

Xem thêm

DTC's Commitment

Ensure accurate progress

With experience and support as well as modern machinery, the DTC team always ensures 100% of the committed schedule with the lowest error, minimizing costs for the investor.

Strict quality control

DTC is committed to strict product quality inspection from processing to production to transportation to the construction site. Every structure built always meets the original design.

Safe and economical installation

Owning a team of skilled workers, DTC always conducts the construction process according to the set regulations to minimize errors and loss of construction materials.

Work safety

For the construction process to not have an unfortunate accident, safety work is carried out before each construction day for the day's execution plan and is closely monitored.

Warranty and maintenance

For customers to be assured of the quality of the work, we carry out warranty & maintenance of the project according to a particular cycle right after handing over the project to the customer to put it into operation.

ERECTION PROCESS

The construction process of a pre-engineered steel structure must be carried out in the correct sequence to ensure consistency and professionalism and to limit the errors that can occur during construction.

ERECTION PROCESS

The construction process of a pre-engineered steel structure must be carried out in the correct sequence to ensure consistency and professionalism and to limit the errors that can occur during construction.

Projects

01
Industrial buildings
02
Commercial buildings
03
Civil works
04
Public construction
05
Other works

Projects

Other works
Public construction
Civil works
Commercial buildings
Industrial buildings

TƯ VẤN NGAY

Choose file
CH003, An Loc 02 Building, No. 02 Vu Tong Phan, An Phu Ward, Thu Duc City, HCMC
0902 479 793
tedfast@tedfast.vn
© Designed & Developed by TEDFAST